手机在线看永久av片免费,男人扒开女人的腿做爽爽视频 ,狠狠色噜噜狠狠狠888777米奇,精品人妻无码一区二区三区不卡

NEWS CENTRE


Your Current Location:Home> News> Industry News

Radiator installation method process

Release Time:2021-07-10 17:21:05      Hits:363

Field survey: Surveyors usually come to the door in advance to conduct a preliminary understanding of the households, measure the area of the house, select the installation location, survey the water quality, etc., design an installation plan, and carry out production and installation according to the plan.


Positioning and slotting: For families that do not have a heating system installed, it is necessary to suppress and slot the walls and the ground. First plan the pipeline route, and then slot along the original route.


Lay out the pipeline: Lay the heating pipes one by one along the slotted part, and set the card slot in the laying. If the original system is modified, the original pipeline is also modified at this step.


Pipeline connection: Connect and weld the laid pipelines one by one, and install the water collector and divider.


Pressure test: Test the pressure of the pipeline to ensure that the entire heating system will not leak or crack during use.


Valve installation: Install temperature control valves at the water inlet and return water inlet to ensure that the room temperature can be adjusted separately during use.


Installation accessories: Punch holes in the wall, insert expansion nails, and install hooks for easy fixing of the heater.


Radiator installation: Install after the user's home wall is painted or after the wallpaper is pasted to prevent damage to the heater during wall painting.


Pressure detection: Test the pressure of the heating to the water flow to prevent water leakage and other problems during use.


Heating system acceptance: After the user confirms that the entire heating system is correct, sign for acceptance.


Surface radiator process


Field measurement: measure the area of the house, select the installation location, survey the water quality, etc., design an installation plan, and carry out production and installation according to the plan.


Laying the pipeline: No need to slot, directly install the pipeline in the predetermined way in the design plan.


Pipe connection: Connect and weld the laid pipes one by one, and install the water collector and distributor.


Pressure test: Test the pressure of the pipeline to ensure that the entire heating system will not leak or crack during use.


Valve installation: Install temperature control valves at the water inlet and return water inlet to ensure that the room temperature can be adjusted separately during use.


Installation accessories: Punch holes in the wall, insert expansion nails, and install hooks for easy fixing of the heater.


Radiator installation: Install after the user's home wall is painted or after the wallpaper is pasted, to prevent damage to the heater during wall painting.


Pressure detection: Test the pressure of the heating to the water flow to prevent water leakage and other problems during use.


Heating system acceptance: After the user confirms that the entire heating system is correct, sign for acceptance.


Previous: What should I do if the internal unit of the wall-mounted air conditioner drips?
Next:NO!

Back to list

Products Recommended

The main products of our factory: side blower, ring blower, compound air-conditioning unit, textile dust removal equipment and various air-conditioning components

Contact us

Address: No. 12, Tianjin Road, Economic Development Zone, Xinyi City, Jiangsu Province

Phone: +86-0516-88865398

Mobile: +86-138-0522-5976

Fax: +86-0516-88865398

Email: xfkt2007@163.com

Copyright ? 2021 All Rights Reserved XuZhou XinFeng Air Conditioner Co.